Start with a room and surface register
Interior painting is not one repeated wall item. List ceilings, walls, trim, doors, radiators and fixed joinery by room, then record substrate, existing coating, defects, access and items that remain in place. HSE’s painter guidance separates sanding, filling, painting and spraying because task and setting change the exposure. The same separation makes a quotation boundary inspectable before preparation begins.